Scaling production capacities at our central Ranchi hub, upgrading machinery, and optimizing line workflows to address expanding transmission grid conductor demand.

Ranchi factory expansion
Project Overview
Under Implementation

Strengthening Grid Capabilities with Advanced Conductors.

To address expanding conductor tender queues and utility contracts, we are implementing high-efficiency machinery upgrades and setting up additional drawing and stranding lines at our central Ranchi complex. This strategic capex deployment increases total plant throughput and lowers per-unit conversion costs.

EC Grade Rods

High-purity raw aluminum and copper rods forming the primary material input.

Wire Drawing

High-speed continuous drawing blocks process rods with extreme metallurgical precision.

NEW CAPABILITY

HTLS Conductors

Dedicated manufacturing lines for high-capacity, low-sag transmission wires.

Grid Evacuation

Direct integration into national and state utility grids to service expanding electrification drives.

Machinery Upgrades

Next-Generation Manufacturing Assets.

+40%Capacity Growth
RanchiCentral Complex
Continuous Drawing Lines
01

Continuous Drawing Lines

Continuous Wire Drawing

High-speed multi-die drawing blocks process aluminum and copper rods with extreme precision and minimal surface defects.

Tubular Stranding Machines
02

Tubular Stranding Machines

Precision Stranding

Advanced high-RPM tubular stranders ensure tight concentricity and uniform tension across complex overhead conductor profiles.

Automated Core Reinforcement
03

Automated Core Reinforcement

Composite Core Handling

Precision feeding systems for INVAR and composite cores allow for seamless HTLS conductor manufacturing without micro-fractures.

Heavy Spooling & Quality Control
04

Heavy Spooling & Quality Control

Robotic Spooling & Laser Scanning

Robotic traverse spoolers handle massive conductor drums with inline laser scan defect detection at speeds up to 1000m/min.

Production Capability

Expanding Output Across Portfolios.

Our enhanced infrastructure directly translates to broader product coverage and vastly higher delivery volumes, allowing us to service mega-projects concurrently.

ACSR & AAAC Lines
01
Volume Production Ramp-up

ACSR & AAAC Lines

Doubling traditional utility conductor output to service expanding rural electrification drives.

  • Higher daily tonnage
  • Automated tension control
  • Rapid changeovers
HTLS Conductors
02
Specialized High-Capacity

HTLS Conductors

Dedicated lines for advanced conductors capable of carrying 2x current for smart grid upgrades.

  • Composite core handling
  • Low-sag precision
  • Thermal resilience testing
Covered Conductors
03
Urban Safety Lines

Covered Conductors

Integrated extrusion blocks applying weather-resistant XLPE for congested urban corridors.

  • Triple co-extrusion
  • Tree-wire capability
  • High UV resistance
Market Demand

Driven by Macro-Infrastructure Growth.

Our capacity upgrades are a direct response to a massive surge in infrastructural investments. India's commitment to energy security and grid modernization forms the bedrock of our expansion thesis.

State DISCOM Upgrades

State DISCOM Upgrades

Massive modernization programs by state distribution companies driving sustained demand for overhead conductors.

National Grid Expansion

National Grid Expansion

India's inter-state transmission system is adding tens of thousands of circuit kilometers to integrate new generation capacity.

Renewable Integration

Renewable Integration

Evacuating gigawatts of solar and wind power requires robust high-capacity transmission corridors and HTLS uprating.

Railway Electrification

Railway Electrification

Ongoing 100% electrification drives by Indian Railways require specialized high-strength catenary and contact wires.

Smart Grid Implementations

Smart Grid Implementations

Urban hubs transitioning to smart grids need low-loss, high-efficiency conductors to minimize AT&C losses.

Export Market Reach

Export Market Reach

Increased scale enables competitive bidding for international infrastructure projects in neighboring regions and Africa.

PROJECT TIMELINE

Execution Strategy

20
24
24
25
26
Q1 2024

Planning & Procurement

Finalizing machinery specifications with global vendors and establishing CapEx funding lines.

Q3 2024

Civil Works & Site Prep

Clearing existing footprint, reinforcing shop floors for heavy machinery, and upgrading power supply.

Q2 2025

Machinery Installation

Sequential erection of drawing blocks, stranding machines, and automated spoolers. Initial dry runs.

September 1, 2026

Commercial Production

Full integration into existing workflows, quality lab validation, and initiation of commercial dispatches.

CTA Background

Scaling Operational Frontiers

Strengthening our primary manufacturing hub to command greater market share and deliver robust infrastructure components across India.